2B provides planting design for Hull Greenport enabling works
21 Jul 2011 12:02     A+ | a-

We have just completed a substantial set of planting plans and specifications for works required to re-route a footpath to allow the safe operation of the massive Siemens wind turbine manufacturing plant at Greenport in Hull. The planting design takes account of the diverse native species we identified during our site survey. 

The aim is to provide a biodiverse and attractive mix of meadows, as well as tree and shrub planting which provides a setting for the new footpath/cycleway and knits the design into adjacent planting schemes.


ABP Trees and Planting



ABP Planting Strategy
Older Post Home Newer Post